Case Studies

Epworth Hospital, VIC

View case study

The hospital required new plumbing infrastructure, including a durable internal drainage pipe system, stable enough to withstand temperatures above 50ºC

Mars Petfood Plant, NSW

View case study

Designers required a more durable solution and therefore specified ACO’s stainless steel push-fit waste pipe system

csm_mars-petfood-plant

Thomas Food International

View case study

Replace existing HDPE drainage pipe system beneath the kill floor and processing areas, with a more durable drainage system.